This version of the technical reference will be frozen at CM13. The version in edit form will be available "here".
| Section | Sub Section | Title | Contains... | Author | version | D&S Audit |
|---|---|---|---|---|---|---|
| i | Cover page | - | - | |||
| ii | Table of contents | - | - | |||
| iii | Collaboration List | - | - | |||
| 1 | Introduction |
...[ToC] |
- | - | - | |
| 2 | The Conceptual Design of MICE |
...[ToC] |
- | - | - | |
| 02.01 | Objectives of the MICE experiment |
...[ToC] |
- | - | - | |
| 02.02 | Overview of the MICE design |
...[ToC] |
- | - | - | |
| 02.03 | Measurement Technique |
...[ToC] |
- | - | - | |
| 02.04 | Measurements, beam dynamics and performance |
...[ToC] |
- | - | - | |
| 3 | Simulation |
...[ToC] |
- | - | - | |
| 03.01 | Overview |
...[ToC] |
- | - | - | |
| 03.02 | Code Development Infrastructure |
...[ToC] |
- | - | - | |
| 03.03 | G4MICE Features |
...[ToC] |
- | - | - | |
| 4 | The Magnetic Channel and the MICE Magnets |
...[ToC] |
- | - | - | |
| 04.01 | The Magnetic Channel and the MICE Magnets |
...[ToC] |
- | - | - | |
| 04.02 | Design of Coils |
...[ToC] |
- | - | - | |
| 04.03 | Focusing Magnet |
...[ToC] |
- | - | - | |
| 04.04 | Coupling Magnet |
...[ToC] |
- | - | - | |
| 04.05 | Tracker Solenoid Magnet |
...[ToC] |
- | - | - | |
| 04.06 | Cooling the magnets and the use of closed cycle coolers |
...[ToC] |
- | - | - | |
| 04.07 | Magnetic Measurements |
...[ToC] |
- | - | - | |
| 5 | The MICE RF System |
...[ToC] |
- | - | - | |
| 05.01 | Cavity and Coupling Coil Module |
...[ToC] |
- | - | - | |
| 05.02 | RF Power System |
...[ToC] |
- | - | - | |
| 05.03 | Cavity Radiation |
...[ToC] |
- | - | - | |
| 6 | The Absorber and Focus Coil Module |
...[ToC] |
- | - | - | |
| 06.01 | Introduction |
...[ToC] |
- | - | - | |
| 06.02 | Liquid-hydrogen Absorbers |
...[ToC] |
- | - | - | |
| 06.03 | Focusing Coil |
...[ToC] |
- | - | - | |
| 06.04 | Force Management |
...[ToC] |
- | - | - | |
| 06.05 | Cooling the Magnet and Absorber with Cryocoolers |
...[ToC] |
- | - | - | |
| 06.06 | Absorber Design Details |
...[ToC] |
- | - | - | |
| 06.07 | The Window Tests |
...[ToC] |
- | - | - | |
| 06.08 | Window seals |
...[ToC] |
- | - | - | |
| 06.09 | Control & Instrumentation |
...[ToC] |
- | - | - | |
| 06.10 | QA requirements |
...[ToC] |
- | - | - | |
| 06.11 | Cool-down of the absorber |
...[ToC] |
- | - | - | |
| 06.12 | OPERATIONAL Procedures |
...[ToC] |
- | - | - | |
| 7 | The MICE Muon Beam Line |
...[ToC] |
- | - | - | |
| 07.01 | Introduction |
...[ToC] |
- | - | - | |
| 07.02 | ISIS Proton Beam Structure |
...[ToC] |
- | - | - | |
| 07.03 | MICE Target at ISIS |
...[ToC] |
- | - | - | |
| 07.04 | Beamline Design |
...[ToC] |
- | - | - | |
| 07.05 | Expected Performance |
...[ToC] |
- | - | - | |
| 07.06 | Beam Line Vacuum System |
...[ToC] |
- | - | - | |
| 07.07 | MICE Beam Diagnostics |
...[ToC] |
- | - | - | |
| 07.08 | Controls |
...[ToC] |
- | - | - | |
| 07.09 | Interference with ISIS |
...[ToC] |
- | - | - | |
| 07.10 | Schedule |
...[ToC] |
- | - | - | |
| 8 | Detectors |
...[ToC] |
- | - | - | |
| 08.01 | Overall description, functionality and redundancy |
...[ToC] |
- | - | - | |
| 08.02 | Scintillators for timing, trigger and upstream PID. |
...[ToC] |
- | - | - | |
| 08.03 | Upstream Cherenkov detector for p-m-e separation revised 2006-07-12 | - | - | - | - | |
| 08.04 | Tracker module |
...[ToC] |
- | - | - | |
| 08.05 | The Downstream Region (To be revised) |
...[ToC] |
- | - | - | |
| 08.05.01 | The magnetic shield |
...[ToC] |
- | - | - | |
| 08.05.02 | Beam characteristics in the downstream region and constraints for the detectors |
...[ToC] |
- | - | - | |
| 08.05.03 | Downstream TOF2 detector |
...[ToC] |
- | - | - | |
| 08.05.04 | The downstream Cherenkov (Kept for information) |
...[ToC] |
- | - | - | |
| 08.05.05 | The electromagnetic calorimeter (EMCAL) (to be revised). |
...[ToC] |
- | - | - | |
| 08.06 | DAQ, trigger, on-line monitoring |
...[ToC] |
- | - | - | |
| 08.07 | Safety |
...[ToC] |
- | - | - | |
| 9 | Layout and Infrastructure |
...[ToC] |
- | - | - | |
| 09.01 | Hall layout |
...[ToC] |
- | - | - | |
| 09.02 | Radiation Shielding |
...[ToC] |
- | - | - | |
| 09.03 | Magnetic Shielding |
...[ToC] |
- | - | - | |
| 09.04 | Magnetic forces |
...[ToC] |
- | - | - | |
| 09.05 | Support Structure |
...[ToC] |
- | - | - | |
| 09.06 | Infrastructure and services |
...[ToC] |
- | - | - | |
| 09.07 | Hydrogen System |
...[ToC] |
- | - | - | |
| 09.07.02 | R&D Hydrogen Delivery System |
...[ToC] |
- | - | - | |
| 09.08 | Electrical Power and Cooling Water |
...[ToC] |
- | - | - | |
| 09.09 | Vacuum system |
...[ToC] |
- | - | - | |
| 09.10 | Controls Infrastructure |
...[ToC] |
- | - | - | |
| 09.11 | Civil Engineering |
...[ToC] |
- | - | - | |
| 09.12 | Safety |
...[ToC] |
- | - | - | |
| 10 | Controls – Instrumentation and Monitoring |
...[ToC] |
- | - | - | |
| 10.01 | A Possible Concept |
...[ToC] |
- | - | - | |
| 11 | Safety Issues |
...[ToC] |
- | - | - | |
| 11.01 | Safety Issues |
...[ToC] |
- | - | - | |
| 11.02 | Hydrogen Safety |
...[ToC] |
- | - | - | |
| 11.03 | Radiation from the Synchrotron |
...[ToC] |
- | - | - | |
| 11.04 | Cavity X-ray production and shielding |
...[ToC] |
- | - | - | |
| 11.05 | Magnetic Fields |
...[ToC] |
- | - | - | |
| 11.06 | Cryogenic Safety |
...[ToC] |
- | - | - | |
| 11.07 | Engineering Systems |
...[ToC] |
- | - | - | |
| 11.08 | Safety Plan |
...[ToC] |
- | - | - | |
| 11.09 | RAL Safety Codes |
...[ToC] |
- | - | - | |
| 12 | Quality Assurance, Control and Monitoring |
...[ToC] |
- | - | - | |
| 12.01 | Quality Assurance and QA Monitoring |
...[ToC] |
- | - | - | |
| 12.02 | Quality Control and Quality Assurance Procedures |
...[ToC] |
- | - | - | |
| 13 | The MICE WBS |
...[ToC] |
- | - | - | |
| 14 | Summary |
...[ToC] |
- | - | - | |
| 15 | References |
...[ToC] |
- | - | - |